Post Frame Building Definition

by Aaron Halberg, P.E.
Halberg Engineering LLC

What is a Post Frame Building? It is essentially a structural framing system used in a wide variety of building applications. More people every day are becoming aware of the economic and environmentally sustainable advantages of Post Frame construction. To address the need for a clear definition of the Post Frame Building system, the following definition was recently approved by the National Frame Building Association (NFBA) Technical & Research committee under the guidance of Dr. Harvey Manbeck:

"Post-Frame Building System. A post-frame building system is characterized by primary structural frames of posts as columns and trusses or rafters as roof framing. The roof framing is attached to the posts, either directly or indirectly through structural headers. Posts are typically graded lumber, graded timbers, laminated lumber or fabricated of composite or hybrid material. Posts are embedded in the soil and supported on isolated footings, or are attached to the top of piers, concrete or masonry walls, slabs-on-grade, or other suitable foundations. Secondary framing members, purlins in the roof and girts in the walls, are attached to the primary framing members to provide lateral support and to transfer sheathing loads, both in-plane and out-of-plane, to the posts and roof framing. Structures are sheathed with a wide variety of materials, including metal and wood structural panels or other suitable materials."

Post Frame buildings are cost effective and enviornmentally sustainable because they use a large amount of renewable structural material and use all materials very efficiently compared to alternative framing systems. Post Frame buildings can be finished with the same interior and exterior finishes of any other framing system or, for ultimate cost savings, they can be covered with light gauge steel panels (similar to pre-engineered steel buildings) which serve as both exterior finish and structural element (replaces the OSB and lap siding with just one material). The material efficiency of Post Frame construction does require a higher degree of certainty in the engineering than other types of construction having more built-in redundancy.

Halberg Engineering is an independent structural engineering consultant specializing in the engineering of Post Frame buildings in a wide variety of applications: commercial, residential, and agricultural. If you have any questions or engineering needs for Post-Frame construction give us a call at 866-694-8602 and ask for Aaron.

Friday, January 30, 2009

Plan Review of Lighting for Commercial Buildings in Wisconsin

reposted here from Safety & Buildings website:
Wisconsin Safety and Buildings Announcement
January 29, 2009

Subject: Reemphasis on commercial buildings general lighting plans and about submittal of emergency lighting plans.

General lighting and emergency lighting will receive more emphasis during commercial buildings plan reviews by Safety and Buildings Division staff effective March 2, 2009. The Wisconsin Commercial Building Code has included requirements for illumination and electrical energy efficiency since 1980.
S&B has been flexible over time about requesting submittal and approval of lighting design plans and calculations. At times division staff have asked for more lighting information than at other times. Whether submitted for review or not, lighting code compliance has been necessary. S&B will renew review of general lighting plans because of concerns that compliance with recent energy efficiency code changes has not been demonstrated.
In March of 2008, substantial emergency lighting and lighting energy efficiency changes occurred; some of the energy efficiency factors have become 30 - 40 percent more stringent. With our nation's and state's focus on building lifetime energy usage, the building lighting designs need to be clearly recognized as consequential.The specific aspect of plan review of emergency lighting plans, important to the safety of occupants and first responders, comes from field observations that some emergency lighting installations are not meeting code requirements. The fact that emergency lighting is often installed late in construction, even after partial occupancy of a building, may have led to less-than-necessary coordination of egress paths and emergency lighting design and installation.
Beginning March 2, 2009, submittal of general lighting plans and emergency lighting plans will be required by the Safety and Buildings Division for plan reviews for: - New buildings; - Additions to buildings;- Initial tenant build-outs within buildings for which initial plans were received on or after March 2.
For plans received on or after March 2, 2009, if S&B commercial building plan reviewers find general lighting and emergency lighting plans have not been submitted for review with the initial building plan review, the reviewers will contact the designer with the option of the designer providing lighting plans as part of the immediate review. If the designer chooses to not do so, the general lighting plan and emergency lighting plan can be submitted later, before installation, for separate plan review.
Fees for the plan reviews are not increased:- For general lighting or emergency lighting plans submitted with building or HVAC plans, there will be no additional fee. (Overall fee calculated per code, Comm 2.31.)
For lighting plans submitted separate from building or HVAC plans, the fee will be the current $75 revision plus the $100 submittal fee, a total of $175. (Per Comm 2.31(1)(f).)
For submittal of plans after construction, the standard late submittal fee of $250 will be assessed, as well as the $100 submittal fee, for a total of $350. (Per Comm 2.31(1)(d)6.)
See the S&B WebSite for general lighting and emergency lighting code and submittal information.